免费精品AB,亚洲日韩性欧美中文字幕,鲁丝无码一区二区三区,精品久久久久久成人AV,看av免费毛片手机播放,精品国际久久久久999波多野,又黄又爽又刺激又色的视频,亚洲无线码一区二区三区在线观看

        China's first tidal power unit connected to grid for one year

        Source: Xinhua| 2018-06-01 16:15:41|Editor: Li Xia
        Video PlayerClose

        HANGZHOU, June 1 (Xinhua) -- China's first tidal power station has been connected to the grid for a year, the longest stable use of the renewable energy, according to the developer.

        The 3.4 mega-watt generating unit built by Hangzhou Lin Dong Ocean Energy Technology Co. Ltd. in Zhoushan City, east China's Zhejiang Province, has sent over 800,000 kilowatt hours of electricity to the grid.

        Lin Dong, chief engineer and chair of the company, said on Thursday that when all turbines of the generating unit are installed in November, it will have an annual power output of 6 million kilowatt hours, enough for supplying electricity for 3,000 households annually.

        The previous record of tidal energy power generation was set in Britain with a four-month supply in 2015.

        He said the company is aiming at building a 15 mega-watt or 20 mega-watt power unit that can break even the cost, making the sustainable energy feasible.

        Lin is expecting foreign orders, with representatives from Canada and New Zealand interested.

        TOP STORIES
        EDITOR’S CHOICE
        MOST VIEWED
        EXPLORE XINHUANET
        010020070750000000000000011100001372231461